Skip to page content

Medway Maritime Hospital MHDU - PISO

PISO were appointed to deliver new flooring solutions within the existing unused High Dependency Unit located within the heart of Medway Maritime Hospital premises.

Due to the central location within the hospital, amidst the COVID-19 pandemic, PISO’s project team were faced with a multitude of logistical, health and safety challenges in order to effectively deliver the scope of works. In collaboration with the client, PISO prioritised the formation of a detailed risk register, identifying all associated risks and their subsequent impacts before producing a mitigation strategy along with a Logistics plan. This detailed pre-planning and assessment paved the way for the installation phase to commence, with a series of control measures in place to ensure the safest work environment possible whilst causing minimum disruption to surrounding wards.

02

Services

Site Services

It is our policy to make an initial site visit whenever possible, in order to check measurements, assess the quality of the sub-floor and to discuss your requirements.

More Info >

Sub-Floor Preparation

Sub-floor preparation is the key to a superior final finish.

More Info >

Installation

By operating several specialists teams we achieve the best possible results when fitting a wide range of flooring solutions.

More Info >

Maintenance

Using quality products and correct installation techniques will help every floor to perform its best for years to come, but we can also provide additional help where required.

More Info >